Freeman and Valley Creek, Elizabethtown
Project Manager (2010)
Stormwater

Stormwater master plan recommended constructing relieve channel between Freeman and Valley Creek to bypass runoff when it reaches certain stages along Freeman Creek to relieve flooding at Freeman Creek Watershed. Vision Engineering scope of services consisted of evaluating exiting hydrological and hydraulic model, design channel, and obtain necessary permits. Unsteady state analysis of the relieve channel scenario revealed adverse impact on Valley Creek watershed, the recommendation was to replace College Street Culvert by 80 ft span Bridge and raise the vertical alignment of College Street The scope of services included permitting from COE and KDOW.
Vision Engineering, LLC
128 East Reynolds Rd, Suite 150
Lexington, KY 40517
859.559.0516
859.523.0095 fax


Employee Webmail