LEXINGTON, KY
SURVEYING EXPERIENCE, PROJECT

A new Man o’ War Boulevard right turn lane was designed to serve the Mapleleaf Shopping Center outlots and provide better access and traffic circulation.
A survey was conducted utilizing Topcon Hiper V dual frequency receivers and a Topcon PS-103 robotic total station. Bearings are based on a static GPS observation and resulting Opus Solution and referenced to the Kentucky State Plan Coordinates (North) (NAD 1983). The Vertical Datum was NAVD 1988 as derived by static GPS observation. The Survey met the minimum standards as defined by 201 KAR 18:150 for an urban class survey.