Construction Admin/Mgmt
The construction phase of a civil engineering project includes preparation of P&S for subsequent construction contracts, review of selected construction contracts, site visits, support for claims and modifications, development of opera- tion and maintenance (O&M) manuals, and preparation and maintenance of as-built drawings. Site visits must be made to verify that conditions match the assumptions used in designing the civil project features. Site visits may also be necessary to brief the construction division personnel on any technical issues which affect the construction. The O&M manual and water control manual will be completed and fully coordinated with the local sponsor during this phase of the project. As-built drawings are prepared and maintained by engineering during the construction phase.
Scheduling
Shop Drawing Reviews
Resident Representatives
Construction Management
Vision Engineering, LLC
128 East Reynolds Rd, Suite 150
Lexington, KY 40517
859.559.0516
859.523.0095 fax


Employee Webmail