KY Division of Water Statewide FEMA Map Risk
Project Manager (2011)
Streams

Scope of services included Hydrological and Hydraulic analysis for detail study of North Elkhorn, I-75 tributary, East I-75, tributary, Cane Run tributary, Pleasant Ridge tributary, Two Ponds tributary, Brighton tributary, Iron Works tributary, Pipeline tributary, Quarry tributary, Radio tower tributary, South Elkhorn tributary, Stonewall tributary, and Todd's tributary approximately 98 miles of streams. The hydrological/hydraulic study was conducted per FEMA guidelines and specifications for Flood Hazard Mapping Partners. Appendix C: Guidelines for Reverie Flooding Analysis and Mapping, November 2009. The outcome is used to establish base flood elevation and delineate the floodplain and floodway for multiple storm events, including 10, 25, 100, and 500 year.